- 0
- 0
- Days
- 0
- 0
- :
- 0
- 0
- :
- 0
- 0
US $5.56
YOUR PRICES00 Days 00 : 00 : 00
I Want Mixed Products
Dyed Natural Long Oval Wood Beads, Oval/Oblong, Lead Free, Green, 23x8~9mm, Hole: 2.5mm, about 2000pcs/1000g(WOOD-Q003-23x8mm-06-LF)
Comments: Please input your mixed request.
Item Code: Please input the item code.
Comments: Please input your mixed request.
Dyed Natural Long Oval Wood Beads, Oval/Oblong, Lead Free, Green
Size: about 23mm long, 8~9mm wide, Hole: 2.5mm; about 2000pcs/1000g.
Priced per 1,000 g
Please Note: The color may be slightly different from the picture because of different display device.
Size | 23x8~9mm, Hole: 2.5mm, about 2000pcs/1000g |
Material | Maple Wood |
Color | Green |
Shape | Oval |
Usage | Beads |
Package Size | 1,000 g per package |
Search by Image
·Search mybeadsfindings with an image instead of text. Try dragging an image here.
Uploading File